Is my galvanized service line "galvanized requiring replacement"?
A galvanized service line is galvanized requiring replacement (GRR) when it is, or ever was, downstream of a lead service line, or when it is downstream of a line of unknown material (40 CFR 141.2). In practice that means a galvanized customer side is GRR unless your records show the system side was never lead. A copper system side today does not prove it never was lead. If any portion of the line is lead, the whole line is Lead, not GRR. GRR lines go into the replacement pool, and their customers get a letter within 30 days.

Check an inventory free, no sign-up Decide one line
Linewarden is web software by Atesen Software, the publisher of this guide. It classifies every line in your spreadsheet with EPA's rules and shows the reason. It is independent of EPA and is not legal or engineering advice.
Decide one line
| What your records show | Entire-line classification | Why |
|---|---|---|
| Any portion is lead (system or customer side) | Lead | Any lead portion makes the whole line Lead |
| Galvanized, and the upstream line is or ever was lead | GRR | Downstream of a lead line, now or in the past |
| Galvanized, upstream material unknown | GRR | Downstream of a line of unknown material |
| Galvanized customer side, copper system side, no record of what was there before | GRR | Nothing shows the system side was never lead |
| Galvanized, with records that the upstream line was never lead | Non-lead | The GRR definition does not apply; keep the record as the basis |
| Material of a portion unknown, no lead found | Lead status unknown | Not proven non-lead; plan how to identify it |
Your State may set stricter wording or evidence rules. Check what material codes it accepts: "PB" in an old file can mean lead or polybutylene.
What a GRR classification changes
- Replacement pool. Lead, GRR and lead status unknown lines in the baseline inventory make up the pool. Replace at least 10% of it a year on average, and all of it by 1 November 2037. Unknowns found to be non-lead come out at the annual update.
- Letters. Every customer served by a lead, GRR or lead status unknown line gets a notification with the required health-effects language within 30 days (40 CFR 141.85(e)), and again after each annual update.
- Baseline inventory. Due 1 November 2027 for community and non-transient non-community systems, with the replacement plan and a public inventory that shows location and material, never customer names (40 CFR 141.84).
- Connectors. New in the LCRI baseline: record a lead, non-lead, unknown or no-connector status for each line.
A whole inventory: check every galvanized line at once
Linewarden reads the inventory spreadsheet you already have, in your browser, and applies the entire-line rule and the GRR definition to every row, with the reason. It lists the rows your State will question with the row number and the fix: duplicate IDs, missing locations, ambiguous codes like "PB", and a replacement date recorded while the material is still lead or galvanized. It counts the replacement pool and writes the customer letters and the public inventory. It does not inspect lines or write the plan narrative.
- Free: the sample, and your own file's counts, problems and first 25 lines on screen, without sign-up.
- Single system: $990 for 12 months, one water system. With code FOUNDING40 until 30 November 2026: $594.
- Multi-system: $1,990 for up to 10 systems ($1,194 with FOUNDING40). Consultant: $3,900, unlimited client systems ($2,340 with FOUNDING40).
- Refund: if Linewarden does not work for your inventory, a full refund within 14 days of purchase (refund policy). Purchase orders: procurement page.
Get a license ($594 with FOUNDING40) Or check the free sample first
Prices from Linewarden pricing, checked 16 November 2026.
Questions people ask
What is a galvanized requiring replacement service line?
Under 40 CFR 141.2, a galvanized service line that is or ever was downstream of a lead service line, or is downstream of a line of unknown material. It must be replaced along with lead lines.
Is a galvanized line behind a copper system side GRR?
Usually yes. Copper today does not show what was there before. Unless your records show the system side was never lead, the galvanized customer side is GRR.
Does a galvanized line count as lead in the LCRI inventory?
No. It is its own category, GRR. But if any portion of the same line is lead, the whole line is classified Lead.
Do GRR customers get a notification letter?
Yes. Customers served by lead, GRR or lead status unknown lines get the required notification within 30 days, and again after each annual inventory update (40 CFR 141.85(e)).
When must GRR lines be replaced?
They are in the replacement pool with lead and lead status unknown lines: at least 10% a year on average, all by 1 November 2037, unless your system qualifies for a deferred deadline.
Sources: 40 CFR 141.2, 141.84 and 141.85(e) (eCFR); Federal Register 2024-23549 (89 FR 86418); EPA: Lead and Copper Rule Improvements. Checked 16 November 2026. A court challenge to the LCRI is pending; the inventory and notification duties of the earlier Lead and Copper Rule Revisions continue in any case.
More: LCRI service line inventory checklist, Linewarden in our catalogue.
Linewarden is independent software. It is not affiliated with or endorsed by the U.S. EPA or any State drinking water program, it does not replace your State's review, and this page is not legal or engineering advice.
Questions about this guide: support@atesensoftware.com.